|
|
|

|

|

|

|

|

|

|

|

|

|

|

|
|
Town of Emmitsburg
300A S. Seton Ave Emmitsburg, Maryland
21727
240-629-6300
|
|

|
Town Manager's
Report May
2007
Prepared by
David Haller
Streets:
-
Staff installed the 'welcome
to Emmitsburg' signs
-
Staff has repaired a number of
street lights
-
Staff installed speed bumps on
Lincoln Avenue and North Avenue
-
Staff coordinated several street
paving projects
-
Staff repaired and cold patched a
few sidewalks on Main Street
Water:
-
Rainbow Lake is maintaining at the
spillway and all wells are holding up well
-
The roughing filters are now being backwashed
twice everyday and the DE filters are
being done once every week
-
Staff has recently flushed the raw
line from Rainbow Lake to the Water Treatment Plant
-
Water production and
consumption. We produced and purchased an
average of 336,537 gpd. We consumed an average
of 303,816 gpd.
-
The difference is
"Backwash Water" ...(9.7%). We purchased
240,800 gals. of water from MSM this month.
-
48.2%
of this water
came from wells
-
0.2.4% of this
water came from Mt. St. Mary's
-
49.4%
of this water
came from Rainbow Lake
Wastewater:
-
Mason Dixon Farms has started
pumping and aerator maintenance has been performed
on Lagoon No. 3
-
We received about 1.4
inches of precipitation this month (the average is 4,5 inches)
-
We have a deficit of 3.7"
of precipitation over the last six
months. The
average precipitation for the period from December 1 thru
May 31 is 22.2" and we have received 18.5" for that period.
-
There was an error in last month's
precipitation computation which indicated that we
had exceeded the six month average by 3.5% when we
exceeded by only 0.8". It is also
important to know that this six month average does
not include Nov. 2006, a month in which we
exceeded the monthly average precipitation by
1.4"
-
Wastewater Treatment:
-
We treated an average
of 286,000 gpd (consumed 303,816 gpd) which means
that 0.0% of the wastewater treated this month was
"wild water". This also indicat4es that
approximately 67% of the 26,424 gpd increase in
consumption this month went to outdoor use
-
We experienced no spills of
untreated sewerage during the month of May
-
We did not exceed the plant's
design capacity during the month of May
Trash:
Parks:
-
Staff worked on the ball fields in
Memorial Park
-
Staff coordinated and worked
with S&W Construction on the replacement of the
roofs on the Bathrooms and pavilion in Memorial Park
-
Staff coordinated the pouring of the
concrete for the new bandstand in Community Park
-
Staff did some painting at the
Community swimming pool
Meetings
Attended:
-
05/05 With Hess Enterprises related
to possible rezoning request at hotel site
-
05/07 With sewer plant design
engineers related to possible treatment methods
-
05/09 With staff to review water
capacity numbers
-
05/10 With Dan Reaver related to his
proposed commercial subdivision
-
05/15 With Planning consultant to
create water capacity section of Comp Plan update
-
05/16 Water & Sewer Master Plan
seminar-Hagerstown
-
05/17 With Mayor and Representatives
of MSM to discuss growth limits delineation
-
05/24 Municipal/BOCC Water &
Sewer Master Plan update
-
05/24 MML POS funding meeting (Got
$70,000 of POS money
List of prior months' Town Manager's reports |
|
|
|
|
|